RCI provided design consultation and review, Live European Cup football resultsProject Management, and inspection services for all aspects of Williams’ MP-261 “Canyon Station” project. The scope of work included engineering Live European Cup football resultsoversight for structural and process design engineering, procurement, scheduling, onshore fabrication, offshore installation, hook-up, and commissioning of the 4-pile jacket and 3-level deck set in a water depth of 299′. This was Williams’ first process facility in the Gulf of Mexico. The facility is the processing and junction platform for the Canyon Express subsea completion gathering pipeline, which gathers product from the Camden Hills, Aconcagua, Kings Peak European Championship live1 and 2, and King subsea completion fields, as well as the Canyon Station “A” production platform. The platform process facilities were designed for 500MMscf/day of gas, 2,000bbl/day of condensate, and 2,000bbl/day of water. The process facilities also included a distillation type Methanol recovery system rated for 2,000bbl/day of MEOH. RCI also managed the installation, testing, and commissioning of two Solar Taurus 60 turbine compressors with Turbo Euro Football results 2024Logix panels and was responsible for the software and panel static tests.

Project Management Scope of Work:

  • RCI provided the Deputy Project Manager/Technical Advisor who managed all aspects of the scope of work outlined above
  • Managed procurement activities including bid processes, contract negotiations, invoice review/approval and cost tracking/reporting

Inspection Scope of Work:

  • Inspection during jacket and deck onshore fabrication
  • Inspection during offshore installation of the jacket and deck
  • Inspection during electrical and instrumentation hook-up work and control system testing